Development
and perspective

History 

II Workflow Stage (2012)

It began
construction Michurinsky Refinery

I Workflow Stage (2009)

Untitled.png

1st Start-Up Complex of the III Workflow Stage (Completed in January 2014)

Untitled.png
  • Unit: Crude Unit - 1.

  • Initial nameplate capacity: 0.4 MTPA.

  • After re-equipment in 2010 nameplate capacity amounted to 0.74 MTPA.

  • Processing depth: 55%.

  • Storage tanks: 52,000 cu.m.

  • 2 either-direction railway tank filling racks.

  • 2 road tanker filling racks.

  • Capacity of crude oil transportation through oil trunk pipelines of Transneft JSC – 0.5 MTPA.

  • Connected to the Shaim – Tambov oil trunk pipeline with the capacity of up to 0.6 MTPA.

  • Units: Crude Unit - 2 with gasoline stabilizer.

  • Initial nameplate capacity: 2.5 MTPA.

  • After re-equipment in 2012 nameplate capacity amounted to 3.3 MTPA.

  • Total capacity of the refinery (Crude Unit - 1 + Crude Unit - 2) made up to 4.0 MTPA.

  • Processing depth: 52%.

  • Storage tanks for 120,000 cu.m (the total volume amounts to 172,000 cu.m).

  • Finished Products Sector with 2 either-direction railway tank filling racks for 71 rail tankers.

  • Capacity of crude oil transportation through oil trunk pipelines of Transneft JSC – 1.7 MTPA.

  • Connected to the Shaim – Tambov oil trunk pipeline with the capacity of up to 1.7 MTPA and Ust-Baluk – Kurgan – Ufa – Almetyevsk (UBKUA) with the capacity of up to 4.3 MTPA. Total capacity equals to 6.0 MTPA.

Simultaneously with construction and commissioning of the workflow stages LLC Michurinsky Oil Refinery acquired and repaired railway station Michurinsky, in the proximity of which the Finished Products Sector (FPS) was built. It is intended for unloading of light refined oil products (gasoline, diesel) by rail.

The FPS is a detached facility connected with the main area of the refinery by means of industrial pipelines with the total length of about 3,0 km located not far from Michurinsky station. The area of the site is 15 ha. There are two either-direction tank filling racks making it possible to load 71 rail tankers at a time with a relay tank terminal of 20,000 cu.m.

Taking into consideration the scale of the III workflow stage objectives its construction is being carried out in several start-up complexes, first of which has been completed in January 2014 and second – in October 2015.

1st start-up complex of the III workflow stage:

  • Unit: Crude Unit - 3.

  • Initial nameplate capacity: 3.7 MTPA.

  • Processing depth: 50%.

  • Storage tanks:  140,000 cu.m (diesel storage tanks – 80,000 cu.m; crude oil storage tanks – 60,000 cu.m; total volume including relay storage tanks volume of FPS – 332,000 cu.m).

  • Five staged water intake, treatment and effluent facilities.

  • Capacity of crude oil transportation through oil trunk pipelines of Transneft JSC – 7.2 MTPA.

  • Connected to the Shaim – Tambov oil trunk pipeline with the capacity of up to 1.7 MTPA and Ust-Baluk – Kurgan – Ufa – Almetyevsk (UBKUA) with the capacity of up to 5.5 MTPA.

2nd Start-Up Complex of the III Workflow Stage (Completed in October 2015)

A diesel fuel hydro treating unit (the licensor and developer of the basic design is the Danish company, Haldor Topsoe) was built at the 2nd start-up complex of the III workflow stage in order to make the diesel quality comply with Euro-5 standard (with the sulfur content of no more than 10 ppm), to provide for the required freezing temperature with a possibility to produce winter and arctic diesel. Hydrogen generation unit with a gas treatment module and elementary sulfur recovery unit (with a granulation module) were built for the purpose of supporting operations of the hydro treating unit.

Units:  

  • First diesel hydro treating unit with the nameplate capacity up to 3.0 MTPA.

  • Hydrogen generation unit with gas amine treatment module, capacity - 25 thousand TPA.

  • Sulphur recovery unit with a granulation module, capacity – 30 thousand TPA.

  • Licensor and developer of the basic design is the Danish company, Haldor Topsoe.

  • Crude unit AT-3 reconstruction for the purpose of total capacity increase up to 5 MTPA.

  • LPG depot for transportation of commercial liquid motor gas Grade PA (Motor Propane) and PBA (motor propane-butane), produced at Crude unit AT-3. The LPG depot capacity makes 50 thousand TPA.

  • Receipt and dispatch of dark oil products base with 6 km of extended lines. Overall receipt and dispatch overcame 300,000 cu.m.

3rd Start-Up Complex of the III Workflow Stage (2016)

The oil processing depth has reached 98% at the 3rd start-up complex of the III workflow stage due to the commissioning of the delayed coking unit with a fuel oil vacuum distillation module. As a result diesel yield is increasing up to 50% from the total refining output. The licensor and developer of the basic design is the American company, Foster Wheeler. The coke resulting from tar carbonization and constituting one of the end products is in great demand with iron and steel industry.

Fuel Oil Advanced Processing Unit consists of:

  • Delayed coking module (with the nameplate capacity of 1.3 MTPA; after revamp in 2016 the total capacity will exceed 1.7 MTPA).

  • Fuel oil vacuum distillation module (with the nameplate capacity of up to 3.6 MTPA).

  • Licensor and developer of the basic design is the American company, Foster Wheeler.

  • Processing depth: 98%.

  • Construction of a new automotive product-loading (auto-loading) facility at the Final Products Site and two 5,000 cu.m intermediate  automobile gasoline tanks.

4th Start-up Complex of the III Workflow Stage (2018)

At the 4th start-up complex started production of high octane Euro-5 gasoline with the octane number of 92, 95 points using a research method due to the commissioning of the gasoline catalytic reforming unit with a continuous catalyst recovery and the isomerization module of light naphtha fractions, which comes from the naphtha hydro treating module to these two units. 

Combined high octane gasoline reforming unit consists of:

  • Gasoline fraction and coking naphtha hydro treating module «Unionfining» (with the nameplate capacity of 900 thousand TPA).

  • Catalytic reforming module with a continuous catalyst recovery (with the nameplate capacity of 300 thousand TPA).

  • Light gasoline fraction isomerization  unit  (with the nameplate capacity of 240 thousand TPA).

  • Licensor and developer of the basic design is UOP.

Currently, the foundation works and underground pipelines at the сombined high octane gasoline reforming unit have been completed; the metal structures have been manufactured, continuous catalyst regeneration, reactors and column facilities have been installed. The production and process facilities are being manufactured and are expected to be delivered to the Refinery in October. Сommissioning activity starts since 2Q 2018.

2019.10.04-451.jpg
Untitled.png
office-4.jpg

The company understands all

importance of human

factor in the development

production and growth labor productivity.

Michurinsky Oil Refinery pursues an active policy aimed at close interaction and satisfaction of the needs of the workforce, former employees and the younger generation. The company adheres to high standards in observance of working hours and rest, labor protection, health and legal protection, as well as protecting the socio-economic interests of young people and creating conditions for the development of cultural and sports and health-improving work in the team.

The company guarantees

  • Accident insurance (around the clock);

  • Periodic medical examinations;

  • Financial assistance;

  • Voluntary health insurance;

  • Corporate and children's events;

  • Gifts for the holidays (anniversaries, New Year gifts);

  • Transport delivery from Tambov.

  • Conducting a special assessment of working conditions

office-4.jpg

In 2016, the Company won the 2nd place in the nomination “For the creation and development of jobs in industrial organizations” at the regional stage of the All-Russian competition “Russian organization of high social efficiency”.

In the development of cultural and recreational activities, the priorities of the Company consist of creating conditions for regular sports activities. The Michurinsky Oil Refinery national football team takes part in regional industry tournaments. The company already has something to be proud of. Silver Cup won!

The company is committed to supporting the children of its employees. For them, events are held, timed to coincide with the International Children's Day, New Year and other significant dates! The company undertakes the organization of offsite family events: visiting theaters, children's entertainment centers, the Tambov Zoo. The company positions itself for its employees as a social partnership enterprise.

The company adheres to strict industrial safety and environmental standards. "Michurinsky Oil Refinery" believes that respect for the nature and safety of production is the key to the successful operation of the enterprise.

Operation of explosive production facilities using equipment operating under an excess pressure of more than 0.07 MPa or at a water heating temperature of more than 115 degrees Celsius.

Federal Service for Environmental, Technological and Nuclear Superv ision (Siberian Department of Rostekhnadzor)

License N2BX-60-002515 dated October 31, 2014 "Operation of explosive and fire hazardous and chemically hazardous production facilities of I, II and Ill hazard classes".

Subsoil Use Department for the Siberian
Federal District (Sibnedra)

License for the use of subsoil, series NOV
No. 02587 VE "Extraction of groundwater

used for drinking and domestic water supply"
License for the use of subsoil, series NOV
No. 02639 VE "Extraction of groundwater
used for technological supply of industrial facilities with water"

Ministry of Transport of the Russian
Federation Federal Service for
Supervision in the Sphere of Transport
(Rostransnadzor)

License series PRO No. 5403917 to carry out
loading and unloading activities in relation to dangerous goods in railway transport.

Sectoral Commission of the Ministry of Energy of Russia for the certification of emergency rescue services (formations) and rescuers of the oil and gas industry, as well as other branches of the fuel and energy complex.

Certificate of attestation for the right to conduct emergency rescue operations series 16 / 2-2 No. 08925.Types of rescue operations:gas rescue operations, rescue operations related to fire fighting.